Skip to main content

Installation

Important installation steps

Read the following instructions carefully. The number is used as a reference in the installation steps where the instruction is applicable.

1

For installation in Sweden, carry out the installation according to the current industry regulations Säker Vatten:

  • The drainage pipe must end in a wet zone area, including a moisture barrier and a floor drain, but cannot end inside the shower space. The inside diameter of the leakage indicator must be at least 20 mm. The outlet must not be placed closer than 60 mm from the waterproofing layer of the floor or adjacent wall.

  • The drainage pipe must be installed with an inclination from the Wall Box down towards the floor.

  • The sleeve must not be deformed. Deformation can cause water leakage.

  • The line from the indication of leakage must be cleaned so that leaking water is not prevented from flowing out.

2

For installation in Sweden, carry out the installation according to the current industry regulations Säker Vatten:

  • A waste water pipeline shall be laid with falls along the entire length of the pipeline.

  • Wastewater pipes must be installed with regard to the movements that can be expected during the construction period and during operation. Fasteners for cables must be mounted and placed according to the supplier's installation instructions. A fastening device must be placed no more than 200 mm from the floor drain.

  • On pipes that are to be cast in, fastening devices are placed according to the supplier's installation instructions, alternatively at all branch pipes, sockets, bends, deposits and on straight sections to a sufficient extent to prevent the pipe's position from changing.