Prepare for tiling
Apply wall covering above and below the Wall Box.

Raise the floor until it is level with the flange on the drain unit.

Form a steep inclination towards the drain unit in accordance with applicable industry standards (min. 2% inclination). Make sure that the lowest part of the inclination is level towards the drain unit surface.
