Prepare for tiling
Apply wall covering above and below the Wall Box.
Raise the floor until it is level with the flange on the drain unit.
Form a steep inclination towards the drain unit according to industry rules (min. 2% inclination). Make sure that the lowest part of the inclination is level towards the drain unit surface.