Skip to main content

Installation

Installing the diverter and hand shower
  1. Cut the conduits to a minimum of 6 mm and a max of 9 mm outside of the tile surface.

    220125_Install_Bypass_block_Cut_sleeve.eps
  2. 220128_R3_cc60_assembly.eps
  3. Mark hole positions for the hand shower holder as well.

    220202_Install_cc60_Diverter_mark_drill_holes_millimeter.eps
  4. Drill four holes (6 mm) in marked locations.

    Caution

    • Only drill through the tile itself.

    • Seal drill holes according to industry rules. See section Seal mountings in wet zone for instructions.

    220131_Install_cc60_drill_holes.eps
  5. Caution

    • It’s important that the PEX hoses are pushed in all the way to ‘stop’ before cutting to the correct length of 25 mm.

    • Make sure the pipe is cut straight and avoid too many degrees. A PEX pipe bevel tool is recommended to avoid damage to o-rings.

    220131_Install_cc60_cut_18_millimeter_length.eps
  6. Caution

    Use 2x included screw, choose screw according to wall thickness.

    220131_Install_cc60.eps

    x2

    TX25 stainless steel screw

    x1

    Twin washer

  7. Use an allen key, 3mm, to secure the diverter body to the diverter wall plate.

    220201_Install_cc60_o-ring.eps
  8. 220202_Install_cc60_hand_shower_cable.eps