Skip to main content

Installation

Prepare shower area
  1. 210429_Standard_prepare_shower_area_floor_x_millimeter.eps
  2. Mark the floor level where the waterproofing will be connected to the drain unit flange. This mark will be used as measurement "X" in the installation process to ensure that there is enough space for the drain unit.

    210420_Prepare_shower_area_mark_x.eps
  3. Caution

    It is crucial that all nogging pieces are level and set according to recommended measurements to avoid misalignment in the shower installation.

    210504_Standard_prepare_shower_area_noggins_2_millimeter.eps
  4. Notice

    Adjust slot in studs and wall covering depending on hand shower and Control Dial placement. Make sure to place the slots to the back, to avoid the wall covering screws damaging the pipes and hoses.

    210323_Standard_prepare_shower_area_slots.eps
    Figure 105. Only valid for Orbital Audio installation
    Only valid for Orbital Audio installation


  5. Apply wall covering according to industry rules.

    210414_Standard_prepare_shower_area_drain_wall_covering_millimeter.eps

    z_box.eps The hole is centered in the shower area.