Prepare for tiling
Raise the floor until it is level with the flange on the drain unit.
Form a steep inclination towards the drain unit according to industry rules (min. 2% inclination). Make sure that the lowest part of the inclination is level towards the drain unit surface.
Apply wall covering according to industry rules.
Figure 39. Only valid for Orbital Audio installationCaution
Make sure to apply construction glue to all wallboard layers.
Mount plasterboards around the Wall Box.
Note
Note that the wall covering should not end edge to edge with the outside of the cabinet. When correctly mounted, the frame of the cabinet lands on the plasterboards.