Installation

Prepare shower area
  1. Frame the shower area.

    210429_Standard_prepare_shower_area_floor_x_millimeter.eps
  2. Mark the floor level where the waterproofing will be connected to the drain unit flange. This mark will be used as measurement "X" in the installation process to ensure that there is enough space for the drain unit.

    210420_Prepare_shower_area_mark_x.eps
  3. Install noggings.

    Caution

    It is crucial that all nogging pieces are level and set according to recommended measurements to avoid misalignment in the shower installation.

    210504_Standard_prepare_shower_area_noggins_2_millimeter.eps
  4. Drill holes in the studs in between the shower area and the place where the Core will be installed.

    Notice

    Adjust slot in studs and wall covering depending on hand shower and Control Dial placement.

    210323_Standard_prepare_shower_area_slots.eps
    Figure 64. Only valid for Orbital Audio installation

    Drill additional holes for the speaker cable.

    Only valid for Orbital Audio installation


  5. Apply wall covering according to the illustration. Follow applicable industry standards.

    210414_Standard_prepare_shower_area_drain_wall_covering_millimeter.eps

    z_box.eps The hole is centered in the shower area.