Prepare shower area
Frame the shower area.
Mark the floor level where the waterproofing will be connected to the drain unit flange. This mark will be used as measurement "X" in the installation process to ensure that there is enough space for the drain unit.
Install noggings.
Caution
It is crucial that all nogging pieces are level and set according to recommended measurements to avoid misalignment in the shower installation.
Drill holes in the studs in between the shower area and the place where the Core will be installed.
Notice
Adjust slot in studs and wall covering depending on hand shower and Control Dial placement.
Figure 64. Only valid for Orbital Audio installationDrill additional holes for the speaker cable.
Apply wall covering according to the illustration. Follow applicable industry standards.
The hole is centered in the shower area.