Skip to main content

Installation

Prepare for hand shower and diverter
210521_diverter_bracket_comp_overview.eps

If installing Orbital Shower without the hand shower or with third-party components, please note that the following steps need to be adapted to the chosen installation scenario. When using third-party components, make sure to fulfill Orbital's requirements and follow the supplier's instructions.

  1. Draw the pipes from the shower area to the position where the Core will be installed.

    240327-Cabinet-Pipes_Shower_Area_to_Core.eps
  2. 240327-Cabinet-Diverter_Bracket_Assembly.eps
  3. Caution

    • The Core shall be connected to the top inlet.

    • The shower head shall be connected to the bottom inlet.

    210524_diverter_bracket_assembly_2.eps
  4. 210524_Standard_diverter_bracket_assembly_3.eps
  5. Caution

    • The Core shall be connected to the top inlet.

    • The shower head shall be connected to the bottom inlet.

    210323_Standard_install_diverter_bracket_millimeter.eps

    x2

    Countersunk stainless steel screw

  6. Make sure the shower head and the Control Dial are centered vertically.

    210702_Standard_install_diverter_bracket_millimeter_closeup.eps

    x2

    Countersunk stainless steel screw