Skip to main content

Installation

Prepare for tiling
  1. Raise the floor until it is level with the flange on the drain unit.

    191119_Remote_pre_inst_raise_floor.eps
  2. Form a steep inclination towards the drain unit according to industry rules (min. 2% inclination). Make sure that the lowest part of the inclination is level towards the drain unit surface.

    201201_Standard_prepare_tiling_inclination.eps
  3. Apply wall covering according to industry rules.

    210325_Remote_pre_inst_wall_covering_center.eps
    Figure 110. Only valid for Orbital Audio installation

    Caution

    Make sure to apply construction glue to all wallboard layers.

    Only valid for Orbital Audio installation