Skip to main content

Orbital Service Handbook

Verify the shower

The final step is to start the shower to verify that it works as intended.

  1. Turn on the power and water supply. It takes about 1 minute for the Core to start up.

  2. Start the shower and set the temperature to 25 °C.

    230621_instruction_-_start_and_stop_shower.eps
    240925_instruction_-_adjust_temperature_to_25.eps
  3. Let the shower run, and check that the recirculation starts within 5 minutes. This should be displayed on the Control Dial screen.

    240925_control_dial_litres_saved.eps
  4. Inspect all water connection points for leakage. Carefully check each connection point to ensure there are no leaks.