Skip to main content

Orbital Service Handbook

15. UV lamp & quartz glass

This instruction shows how to swap the UV lamp and quartz glass in a remote installation (shower model Hatch LK, Hatch Cabinet or Basic). The Core is placed outside of the shower area. Follow the instructions in detail, and don't hesitate to reach out if you have any questions - support@orbital-systems.com.

Use the kit below to swap the UV lamp and quartz glass.

Table 48. 1-04-0180 - Maintenance kit 2:

UV lamp

Quartz jacket kit



Dismantle Filter & UV

  1. Turn off the power.

    231213-Turn_on_power.eps
  2. Open the door and remove the splash guards. Put them aside.

    231208-Open_Hatch_Cabinet.eps
  3. Open the filter door and release the filter holder.

    240312-Open_Core_and_Filter_Hatch.eps
  4. Remove the Filter Capsule

    240312-Remove_Filter.eps
  5. Unscrew the UV protection cover.

    240313-Remove_UV_protective_shield.eps
  6. Turn the plug counterclockwise to release the UV lamp.

    240313-Remove_UV_contact.eps
  7. Disconnect the lamp and put it aside.

    240417_1-02-0045_R3_change_UV_lamp_1.eps
  8. Turn the bayonet lock counterclockwise to release the quartz glass.

    240417_R3_clean_glass_2.eps

Install UV lamp & quartz glass

  1. Change the quartz glass and tighten the bayonet lock.

    Caution

    Make sure the o-ring is undamaged and in good condition.

    240313-Insert_new_UV_glass_and_lock.eps
  2. Plug in the new UV lamp, turn the plug clockwise to lock.

    Caution

    Make sure that the lamp goes all the way into the socket.

    240418_1-02-0045_R3_change_UV_lamp_and_Q_glass.eps
  3. Replace the UV protection cover.

    240418_change_uv_lamp_reassemble_R3.eps
  4. Insert the new Filter Capsule.

    Caution

    Ensure that the Filter Capsule is correctly inserted to avoid leakage.

    240312-Insert_Filter.eps
  5. Close the filter holder and the filter hatch.

    240312-Close_filter_hatch_and_Core.eps
  6. Put the splash guards back in place and close the door to the Wall Box.

    231211-Close_Hatch_Cabinet_and_remove_protection_sheets.eps
  7. Turn on the power. It takes about 1 minute for Core to start up.

    231213-Turn_on_power.eps
  8. Start the shower and set the temperature to 28°C. The shower should start recycling (showing countdown on Control Dial) within 5 minutes without increased noise level.

    231120_instruction_-_start_and_stop_adjust_temperature.eps
  9. Turn off the shower.

    231211_stop.eps
  10. Complete and submit the service report (found in the service request).

  11. Recycle the replaced components. 240516-Recycling.eps