Skip to main content

Orbital Tap Installation

Prepare bathroom
  1. Prepare the installation area for incoming hot and cold water, drain, and electricity.

    B = Area where the electrical outlet can be placed.

    231227-Recommended_measurements_for_outlets.jpg
  2. Install the connection to the toilet cistern. Adapt the piping according to the installation scenario. The distance between the Pump and the toilet cistern can be a maximum of 6 meters.

    231025_Pipe_to_toilet.ai
  3. Apply wall covering, tiling, and commode according to industry rules and the supplier's instructions.

    231025_Commode_in_bathroom.ai