Skip to main content

Orbital Shower Installation

Prepare for hand shower and diverter
210521_diverter_bracket_comp_overview.eps

If installing Orbital Shower without the hand shower or with third-party components, please note that the following steps need to be adapted to the chosen installation scenario. When using third-party components, make sure to fulfill Orbital's requirements and follow the supplier's instructions.

  1. 240328-Basic-Pipes_Shower_Area_to_Core.eps
  2. 240327-Cabinet-Diverter_Bracket_Assembly.eps
  3. 210524_diverter_bracket_assembly_2.eps
  4. 210524_Standard_diverter_bracket_assembly_3.eps
  5. Caution

    • The Core shall be connected to the top inlet.

    • The shower head shall be connected to the bottom inlet.

    210323_Standard_install_diverter_bracket_millimeter.eps

    x2

    Countersunk stainless steel screw

  6. Make sure the shower head and the Control Dial are centered vertically.

    210702_Standard_install_diverter_bracket_millimeter_closeup.eps

    x2

    Countersunk stainless steel screw