Skip to main content

Orbital Shower Installation

Prepare shower area
230419_Panel_Drainage_bend_comp_overview.eps
  1. 201123_Prepare_shower_area_mark_x_millimeter.eps
  2. Mark the floor level where the waterproofing will be connected to the drain unit flange. This mark will be used as measurement "X" in the installation process to ensure that there is enough space for the drain unit.

    210420_Prepare_shower_area_mark_x.eps
  3. Caution

    It is crucial that all noggin pieces are level and set according to recommended measurements to avoid misalignment in the shower installation.

    200124_Prepare_shower_noggins_measurements_millimeter.eps
  4. Apply wall covering according to industry rules.

    240410_Prepare_shower_area_Wall_covering.eps