Skip to main content

Installation

[en] Installation requirements
231130_Installation_Requirements-Tank.ai

[en] A. The bottom valve outlet must be placed higher than the inlet on the Tank (minimum 1% decline).

[en] B. The Pump needs to be placed within 6 m from the toilet cistern. The cable between the Pump and the Tank is 1 m (extension cords available on request). The Pump must not be placed higher than the Tank.