[en] Prepare bathroom
[en] Prepare the installation area for incoming hot and cold water, drain, and electricity.
[en] B = Area where the electrical outlet can be placed.

[en] Install the connection to the toilet cistern. Adapt the piping according to the installation scenario. The distance between the Pump and the toilet cistern can be a maximum of 6 meters.
