Skip to main content

Installation

[en] Prepare bathroom
  1. [en] Prepare the installation area for incoming hot and cold water, drain, and electricity.

    [en] B = Area where the electrical outlet can be placed.

    231227-Recommended_measurements_for_outlets.jpg
  2. [en] Install the connection to the toilet cistern. Adapt the piping according to the installation scenario. The distance between the Pump and the toilet cistern can be a maximum of 6 meters.

    231025_Pipe_to_toilet.ai