Installation requirements
Please review and confirm the following installation requirements. These are crucial for the proper installation and functioning of the shower system.
If you have any questions or need further clarification on the installation requirements, feel free to contact us at Orbital.
Notice
If you are planning an installation in the United States, please refer to the installation requirements provided here.
Internet Connection: Password-protected WiFi (2.4 GHz / 5 GHz) or Ethernet
Residual Circuit Breaker: One breaker per Shower Core
Power Supply: One Phase, 230VAC / 50 Hz / 16A
Mains Supply Wire: Minimum 2.5 mm² (rated for 16 A circuit)
Incoming Water Supply Connections: Separate hot & cold
Incoming Cold Water Temperature: 4-25°C
Incoming Hot Water Temperature: 50-65°C
Maximum Working Pressure Tap Water: PN10
Incoming Water Pressure: 2-10 bar
Water Supply Flow: 9 liters/minute per inlet hot & cold
Water Hardness: 3°dH-14°dH , or 53-250mg CaCO₃/liters
Water Iron Content: <0.3 mg/liter
Tile Thickness in shower zone: Max 10 mm
Distance from drain center: Max three meters
Vertical positioning: Highest placement below head shower, lowest 10 cm from floor
Number of bends on pipe: Max three
Placed in a warm environment
Power issues: For insufficient power, Orbitals provides load balancing to evenly distribute electrical loads, preventing overloads.
Low water pressure: A reciprocating pump is recommended to effectively boost water pressure in systems.
Water hardness: To counter high water hardness, using a water softener helps in reducing mineral buildup and improving system efficiency.